blackstone 1

Blackstone Station
at Harvard University
Cambridge Massachusetts

A field survey and AutoCAD "as-built" drawings were needed for a century old steam plant to show column lines, wall elevations, catwalks, platforms, and equipment locations. Ross Engineering coordinated work with a mechanical engineer for a major co-gen overhaul. Our company prepared the structural design and the drawings for a new boiler support structure. We also surveyed contaminated soils to calculate quantities and we surveyed the underground steam tunnels to monitor deflection.

drawing drawing